Publications

Folder PR18 responses

Documents

Toggle Title Date
pdf RDG response to ORR consultations: 1. Holding Network Rail to account; 2. ORR's approach to assessing the quality of Network Rail's stakeholder engagement in CP6 ( pdf, 483 KB ) (738 downloads)
pdf RDG response to ORR consultations: 1. Implementing infrastructure cost charges for open access operators; 2. ORR's draft guidance on the economic equilibrium test ( pdf, 472 KB ) (747 downloads)
pdf RDG response to the consultation on the role of ORR in enhancements in CP6 ( pdf, 608 KB ) (605 downloads)
pdf RDG response to ORR consultation on the Draft Determination ( pdf, 707 KB ) (675 downloads)
pdf RDG response to ORR consultation on changes to the network licence ( pdf, 607 KB ) (689 downloads)
pdf RDG submission to ORR on Schedule 4 cost compensation for CP6 ( pdf, 1.13 MB ) (1038 downloads)
pdf RDG response to ORR Working Paper 8: Managing change affecting the PR18 settlements ( pdf, 409 KB ) (557 downloads)
pdf RDG response to ORR consultation on assessing Network Rail’s efficiency and wider financial performance in CP6 ( pdf, 339 KB ) (703 downloads)
pdf RDG response to ORR consultation on amending Schedule 4 notification factors ( pdf, 513 KB ) (800 downloads)
pdf RDG response to ORR Working Paper 7: Collaborative working on the rail network ( pdf, 701 KB ) (569 downloads)
pdf RDG response to ORR Working Paper 6: The volume incentive ( pdf, 489 KB ) (581 downloads)
pdf RDG response to ORR update on the financial framework for PR18 ( pdf, 531 KB ) (612 downloads)
pdf RDG response to ORR PR18 consultation on charges recovering fixed network costs ( pdf, 572 KB ) (659 downloads)
pdf RDG response to ORR consultation on possible measures of the System Operator’s performance ( pdf, 661 KB ) (621 downloads)
pdf RDG response to ORR consultation on the overall framework for regulating Network Rail ( pdf, 439 KB ) (608 downloads)
pdf RDG response to ORR consultation on improving Network Rail’s renewals efficiency ( pdf, 491 KB ) (683 downloads)
pdf RDG response to ORR consultation on the financial framework for PR18 ( pdf, 256 KB ) (609 downloads)
pdf RDG response to ORR consultation on development of the regulatory settlement for the Network Rail national system operator in CP6 ( pdf, 363 KB ) (598 downloads)
pdf RDG response to ORR PR18 consultation on draft guidance on Network Rail’s strategic business plans ( pdf, 271 KB ) (673 downloads)
pdf RDG response to ORR Working Paper 5: Options for the treatment of enhancements in PR18 ( pdf, 78 KB ) (653 downloads)

Our Members

  • Avanti West Coast logo
  • c2c logo
  • Caledonian sleeper logo
  • Chiltern railways logo
  • crosscountry logo
  • EMR logo
  • Elizabeth line logo
  • Eurostar logo
  • Gatwick Express logo
  • Grand Central logo
  • Greater Anglia logo
  • Great Northern logo
  • GWR logo
  • Heathrow Express logo
  • Hull Trains logo
  • LNER logo
  • LNR logo
  • London overground logo
  • Merseyrail logo
  • Northern logo
  • ScotRail logo
  • Southeastern logo
  • Southern logo
  • SWR logo
  • TPE logo
  • TfW logo
  • WMR logo
  • lumo logo
enfrdeescy

Contact

Rail Delivery Group

Rail Delivery Group Ltd
​First Floor North,
​1 Puddle Dock,
​London,
​EC4V 3DS

  • 020 7841 8000

Copyright © 2020 Rail Delivery Group
About this Website